Date of Closure: July 22, 2024
Time of Closure: 8:00 AM
Reason (Rezón): To perform a sewer lateral replacement
Will Boiling Water Be Required? (Necesitara hervir el agua?): No
What is a Boil Water Advisory? LEARN MORE HERE (¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ)
Estimated Time of Restoration (Tiempo estimado de Restoración): 3:30 PM.
What Happens Next (¿Qué pasa después?):
Updates will be provided via our website (las actualizaciones se...
All Lanes Re-opened for Fourth Street in Brunswick, Ga – June 27, 2024
Date of Closure: June 27, 2024
Time of Closure: 9:00 AM
Reason (Rezón): Road cut to repair water main. Road closure from MLK Blvd to Lee St required
Will Boiling Water Be Required? (Necesitara hervir el agua?): No
What is a Boil Water Advisory? LEARN MORE HERE (¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ)
Time of Re-Opening: 10:19 AM.
What Happens Next (¿Qué pasa después?):
Updates will be provided via our website (las actualizaciones se proporcionarán a...
PLANNED OVERNIGHT ROAD CLOSURE FOR PALM DR/FREDERICA ON SAINT SIMONS ISLAND, GA – JULY 8, 2024
Date of Closure: July 8, 2024, to July 12, 2024
Time of Closures:
Day 1: 8:00 p.m. (July 8, 2024) to 6:00 a.m. (July 9, 2024) – Frederica Road closures, roadway detours, and construction will begin.
Day 2: 8:00 p.m. (July 9, 2024) to 6:00 a.m. (July 10, 2024) – Frederica Road closures, roadway detours, and construction will begin.
Day 3: 8:00 p.m. (July 10, 2024) to 6:00 a.m. (July 11, 2024) – Frederica Road closures, roadway detours, and construction will begin
Day 4: 8:00 p.m. (July 11,...
Planned Road Closure for Fourth Street in Brunswick, Ga – June 27, 2024
Date of Closure: June 27, 2024
Time of Closure: 9:00 AM
Reason (Rezón): Road cut to repair water main. Road closure from MLK Blvd to Lee St required
Will Boiling Water Be Required? (Necesitara hervir el agua?): No
What is a Boil Water Advisory? LEARN MORE HERE (¿Qué es un aviso para hervir agua? PARA APRENDER MÁS HAGA CLIC AQUÍ)
Estimated Time of Restoration (Tiempo estimado de Restoración): 2:00 PM.
What Happens Next (¿Qué pasa después?):
Updates will be provided via our...
Planned Water Outage for Watermain Relocation – HWY17/ Harry Driggers to Jack Hartman Rd – Tuesday, March 19, 2024
Attention
Planned Water Outage
In order for BGJWSC staff to complete maintenance upgrades and main relocation as part of the Highway 17 road widening project, water service will be intermittently unavailable or in low pressure from at or about 9:00 a.m. to 2:00 p.m. on Tuesday, March 19, 2024, for service connections along Hwy 17 between Harry Driggers Blvd and Jack Hartman Rd. Adjacent streets may also be impacted in order to isolate water mains during the repairs.
Once service has...
Emergency Water Outage – Herrington Ln/North Herrington Rd on Saint Simons Island – Tuesday, February 13, 2024
Attention
Emergency Road Closure Notification
To address a stormwater utility conflict in the area, water service on Harrington Lane will be intermittently disrupted beginning at 9:00 am this morning, Tuesday, February 13, 2024, while staff reroutes a distribution main. Service will be restored as quickly as possible. No boil water advisory is expected due to the use of controlled shutdown procedures.
The BGJWSC apologizes in advance for the inconvenience.
Emergency Road Closure for Sewer Collection System Repairs – Parkwood Dr. Shrine Rd – Monday, January 22, 2024
Attention
Emergency Road Closure Notification
Brunswick: To perform sanitary sewer gravity main repairs due to a 12″ line damaged by a contractor, commuters of Parkwood Dr and Shrine Road will experience a delay in traffic. Repairs are underway and should be completed by the end of the day. Homeowner/business access will be maintained but all other traffic should be prepared to take another route.
The BGJWSC apologizes in advance for the inconvenience.
Emergency Road Closure for Sewer Collection System Repairs – 200 Block of Shangri La Ave in Brunswick – Wednesday, January 10, 2024
Attention
Emergency Road Closure Notification
Brunswick: To perform sanitary sewer gravity main replacement due to a collapsed line, commuters of Shangri La Avenue will experience a full road closure on the west end of the 200 block, adjacent to Hornet Dr. The road closure will begin at 8:30 a.m. on Wednesday, January 10th, and last until 5:00 p.m. Homeowner/business access will be maintained but all other traffic should be prepared to take another route.
The BGJWSC apologizes in advance for...
SSI – Wesley Oaks Circle Watermain Improvements – January 9th, 2024
Attention
Road Closure Notification
In order to perform watermain upgrades in the area, Westley Oaks traffic will experience a delay in traffic beginning Tuesday, January 9th, 2024. The road closure will begin at or about 8:00 a.m. and will be an ongoing process. Traffic should be cautious when entering the area.
This work is required due to lines likely installed more than 40 years ago. BGJWSC staff will be working diligently to complete the upgrades in a timely manner. For additional...
Planned Road Closure – Storm Drain Relocation – Wilson Ave/Talmadge – Monday, December 11, 2023
In order for BGJWSC and contract staff to complete the Macon-Talmadge Storm drainage improvement project, please expect some delays in traffic along Wilson Ave. There is a water line on Wilson Ave (at Talmadge) which will need to be relocated to accommodate the storm drain line. We are aware that this will cause a disruption to customers in the area. Contractors will be performing the relocation on Monday, December 11, 2023, between 7:00 am and 4:00 pm.
The map below details the impacted area: