Attention
Planned Water Outage
In order for a private contractor to isolate service connections for repairs in the area, water service will be intermittent beginning at or about 5:00 p.m. on Monday, June 7, 2021 for service connections in the Midway Square Shopping Center.
Repairs are expected to be completed that evening. Once service has been restored, a precautionary boil water advisory may be issued until 24 hours following the last point of repair. Please subscribe to receive emergency...
All-Clear for Boil Water Advisory Issued for Knox Drive in Brunswick
Effective immediately, as of 2:36 PM on Friday, May 28, 2021, all required microbiological testing of water samples from the area affected by the boil water advisory issued for Knox Drive on Thursday, May 27, 2021 have passed. Results have been verified by our state-licensed technician within a certified laboratory environment.
This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.
Though the water from this system can now be considered to meet safe...
Precautionary Boil Water Advisory – Knox Drive in Brunswick – Thursday, May 27, 2021
DRINKING WATER WARNING
BOIL YOUR WATER FOR THREE MINUTES BEFORE USING
The Brunswick water system lost pressure on the distribution network serving Knox Drive in Wavely Pines due to a contractor digging into 6″ Transite main. Service has been restored and BGJWSC lab personnel have collected water samples for testing. This testing, which takes between 18 and 24 hours, should be completed the afternoon of Friday, May 28, 2021 at which time an all-clear message will be posted.
This loss of...
Lane Closure for Repairs – 1600 Block of MLK Blvd – May 17, 2021
Attention
Lane Closure Notification
In order to perform sewer gravity main repairs in the area, one lane of the 1600 block of Martin Luther King, Jr. Blvd in Brunswick, between G and F Street, will be closed to thru traffic. The lane closure will begin at 8:00 a.m. on Monday, May 17 and last until 5:00 p.m. on Tuesday, May 18, 2021. Homeowner access will be maintained but all other traffic should be prepared to take another route to avoid increased traffic and potential delays.
As a function...
Road Closure for Repairs – 1800 Block of Johnston Street – April 29, 2021
Attention
Road Closure Notification
In order to perform sewer gravity main repairs in the area, the 1800 block of Johnston Street in Brunswick, between I and H Street, will be closed to thru traffic. The road closure will begin at 8:00 a.m. on Thursday, April 29 and last until 5:00 p.m. on Wednesday, April 30, 2021. Homeowner access will be maintained but all other traffic should be prepared to take another route.
As a function of routine maintenance funded by our operational budget, this...
Road Closure for Repairs – 1700 Block of Ellis Street – April 17, 2021
Attention
Road Closure Notification
In order to perform sewer gravity main repairs in the area, the 1700 block of Ellis Street in Brunswick, between G Street & H Street, will be closed to thru traffic. The road closure will begin at 8:00 a.m. on Saturday, April 17 and last until 5:00 p.m. on Sunday, April 18, 2021. Homeowner access will be maintained but all other traffic should be prepared to take another route.
As a function of routine maintenance funded by our operational budget, this...
Road Closure for Repairs – 800 Block of T Street – April 15, 2021
Attention
Road Closure Notification
In order to perform sewer gravity main repairs in the area, the 800 block of T Street in Brunswick, between Norwich Street and Ellis Street, will be closed to thru traffic. The road closure will begin at 8:00 a.m. on Thursday, April 15th and last until 5:00 p.m. on Friday, April 16th, 2021. Homeowner access will be maintained but all other traffic should be prepared to take another route.
As a function of routine maintenance funded by our operational...
Emergency Road Closure for Repairs – Intersection of Fourth Street and Reynolds Street – March 31, 2021
Attention
Emergency Road Closure Notification
In order to perform sewer gravity main repairs in the area, the intersection of Fourth Street and Reynolds Street in Brunswick will be closed to thru traffic. The road closure will begin at or about 8:00 am on Wednesday, March 31, and is expected to last for no longer than two days. During this time, all traffic should be prepared to take another route.
This emergency repair due to a collapsing 36″ vitrified clay gravity main is necessary to...
All-Clear for Boil Water Advisory Issued for Gordon Street in Brunswick
Effective immediately, as of 2:17 PM on Wednesday, March 17, 2021, all required microbiological testing of water samples from the area affected by the boil water advisory issued for Gordon Street on Monday, March 15, 2021 have passed. Results have been verified by our state-licensed technician within a certified laboratory environment.
This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.
Though the water from this system can now be considered to meet...
All-Clear for Boil Water Advisory Issued for Seminole on St Simons Island
Effective immediately, as of 12:05 PM on Wednesday, March 17, 2021, all required microbiological testing of water samples from the area affected by the boil water advisory issued for Seminole in Island Club on Tuesday, March 16, 2021 have passed. Results have been verified by our state-licensed technician within a certified laboratory environment.
This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.
Though the water from this system can now be...