Project Number:
District and General Location: North Mainland District in the Community Road Business Area
Total Budget: $TBD
Anticipated Construction Completion Date: Summer 2023
Details: The project consists of 12-inch Water and 12-inch Sewer Extension rehabilitation along the Community Road Business Area in the North Mainland District.
Purpose: The purpose of the project is to provide the capacity to serve and extend critical infrastructure with new service lines. This will reduce the operation...
Project Info – North Mainland – Arco Water & Sewer Extension
Project Number: #2016
District and General Location: North Mainland District in the Arco Area Neighborhood
Total Budget: $4.1M
Anticipated Construction Completion Date: Winter 2022
Details: The project consists of 8-inch Water and 8 to 10-inch Sewer Extension rehabilitation along the Acro Area Neighborhood in the North Mainland District.
Purpose: The purpose of the project is to provide capacity to serve, extend critical infrastructure with new service lines, and enhance fire protection.
Have...
Project Info – Pump Station 2002 Forcemain Replacement
Project Number: #2014
District and General Location: Saint Simons Island District along Arnold Road
Total Budget: $TBD
Anticipated Construction Completion Date: TBD
Details: The project consists of 12-inch forcemain rehabilitation along Arnold Road in the Saint Simons Island District.
Purpose: The purpose of the project is to prioritize pipe repairs, rehabilitation, and replacements based on a risk-based, asset management strategy balancing the probability of a pipe failure versus the consequence...
Project Info – Mainland – Water Pollution Rehab-Academy
Project Number: #906
District and General Location: Academy Creek Water Pollution Control Plant on 2909 Newcastle Street.
Total Budget: $7.2M
Anticipated Construction Completion Date: Summer 2022
Details: The project has a variety of system improvement projects related to rehabilitation or replacement of unit processes and facilities at the plant to ensure continuous and reliable operations.
Purpose: The purpose of the project is to more effectively treat current flows and treat the estimated...
Project Info – Mainland – Basin 4036 CIPP
Project Number: #2001
District and General Location: North Mainland District Pump Station 4036 Gravity Basin
Total Budget: $1M
Anticipated Construction Completion Date: Summer 2022
Details: The project consists of Cleaning, Closed-circuit television, and Cure-in-Place Pipe (CIPP) rehabilitation of the sewer mainline in the North Mainland District Pump Station 4036 Gravity Basin ranging from 15-inch to 30-inch in diameter
Purpose: The purpose of the CIPP process is to reduce and eliminate cracks,...
Project Info – Mainland – SPLOST 2016 Forcemain Reroute
Project Number: #702
District and General Location: North Mainland District along Harry Driggers Blvd, Canal Road, and Ogden Road
Total Budget: $4.7
Anticipated Construction Completion Date: Summer 2022
Details: The project consists of nearly 20,000 linear feet of 12- to 20-inch forcemain and 2,500 linear feet of 12 to 14-inch watermain will be installed via an open cut or trenchless directional drill method.
Purpose: The purpose of the project will reduce maintenance calls and disruptions. The...
Project Info – Systemwide – Annual Galvanized Replacement Program
Project Number: #2021
District and General Location: Various locations in North mainland, South Mainland, and Saint Simons Island District
Total Budget: $250k
Anticipated Construction Completion Date: TBD
Details: The project consists of an annual allotment to remove galvanized lines that have corroded from the inside out, causing pinhole leaks, rusty color water, and fluctuation in water temperature and pressure.
Purpose: The purpose of the project is to improve water quality and system reliability,...
Project Info – Mainland Brunswick – Pump Station 4035-4036 Upgrade
Project Number: #702
District and General Location: PS4035 on Ross Road, North Mainland District and PS4036 on B&W Grade Road, North Mainland District
Total Budget: $2.6M
Anticipated Construction Completion Date: Spring 2022
Details: The project consists of the repair of both station building roofs, painting, along with pump and piping modifications. Detailed station work includes the installation magnetic flow meter, an odor control unit, replacing outdated electrical and SCADA equipment,...
Project Info – Mainland Brunswick – Canal Rd Glynco Watermain Loop
Project Number: #704
District and General Location: North Mainland Brunswick service area between Brunswick Airport and FLETC
Total Budget: $1.2M
Anticipated Construction Start Date: Spring 2021
Anticipated Construction Completion Date: Summer 2022
Details: The project consists of nearly 9,000 linear feet of 12-inch watermain that will be installed via an open cut or trenchless directional drill method pending existing site conditions and constraints such as entranceways.
Purpose: The purpose...