Project Number:
District and General Location: PS 2033 on 2913 Lawrence Road, Saint Simons Island PS 2034 on 130 Rice Mill Road, Saint Simons Island
Total Budget: $1.4M
Anticipated Construction Completion Date: TBD
Details: The project consists of the rehabilitation of Pump Station 2033 and 2034 due to the existing condition North end of Saint Simons Island.
Purpose: The purpose of the project is to ensure continuous delivery of wastewater to the Dunbar Treatment Plant. Improvements include...
Project Info – SSI – Pump Station 2056 Pumps and Forcemain Improvements
Project Number:
District and General Location: Located in the Saint Simons Island District along Lawrence Road.
Total Budget: $700k
Anticipated Construction Completion Date: TBD
Details: The project consists of installing new pumps, discharge piping, and a parallel forcemain.
Purpose: The purpose of the project is to operate with better efficiency, reduce maintenance and provide up-to-date monitoring with enhanced technology. And for the new sewer main installation to reduce maintenance calls...
Project Info – Mall EST and Oglethorpe EST Rehab
Project Number:
District and General Location: Glynn Place Mall EST, North Mainland District Oglethorpe EST, Saint Simons Island District.
Total Budget: $1M
Anticipated Construction Completion Date: TBD
Details: The project consists of rehabilitation and painting for the Elevated Storage Tank (EST) at Glynn Place Mall EST and Oglethorpe EST.
Purpose: The purpose of the project is to provide reliable water supply and pressure for the surrounding community and fire suppression needs while preserving...
Project Info – North Mainland – Pump Station 4105 Forcemain Reroute
Project Number:
District and General Location: Located in the North Mainland District along Cate Road and Crispen Boulevard toward Highway 341.
Total Budget: $1.25M
Anticipated Construction Completion Date: TBD
Details: The project consists of installing a new forcemain from Pump Station 4105 to Highway 341
Purpose: The purpose of the project will reduce maintenance calls and disruptions. The reroute will also be shorter in length than the current alignment, which will result in energy savings...
Project Info – Systemwide – Water Production SCADA
Project Number:
District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District
Total Budget: $750k
Anticipated Construction Completion Date: TBD
Details: The project consists of converting the existing Water Production Supervisory Control and Data Acquisition (SCADA) to the new VTSCADA system. The existing control system receives input from several controls and instruments, many of which are reaching the end of their useful lives and...
Project Info – Academy Creek Ras Replacement
Project Number:
District and General Location: Academy Creek Water Pollution Control Plant on 2909 Newcastle Street.
Total Budget: $1.5M
Anticipated Construction Completion Date: TBD
Details: The project consists of replacing existing return activated sludge (RAS) pumps, piping, and electrical with chopper-style pumps due to the existing equipment systems reaching the end of their service life and needing to be replaced.
Purpose: The purpose of the project is to replace aging equipment to maintain...
Project Info – Systemwide – GA Environmental Finance Authority Loan Debt Service
Project Number:
District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District.
Total Budget: $1.21M
Anticipated Construction Completion Date: TBD
Details: GEFA’s water and sewer financing programs offer low-interest financing for drinking water, reservoirs and water supply, water quality, stormwater and solid waste infrastructure. The JWSC has secured GEFA’s Clean Water State Revolving Fund Loan.
Purpose: The purpose of the loan is to...
Project Info – South Mainland – City of Brunswick – Pump Station 3101, 4001, and 4002 Upgrade
Project Number:
District and General Location: PS3101 on 293 South Port Parkway, South Mainland PS4001 on 301 3rd Avenue, the City of Brunswick PS4002 on 1309 Reynold Street, City of Brunswick.
Total Budget: $TBD
Anticipated Construction Completion Date: TBD
Details: The project consists of the repair of the station roofs, and painting, along with pump and piping modifications. Detailed station work includes the magnetic flow meter installation, odor control unit, replacing outdated electrical...
Project Info – North Mainland – North Mainland Water Loops
Project Number:
District and General Location: North Mainland District Water Loops installation along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway.
Total Budget: $2.M
Anticipated Construction Completion Date: Summer 2023
Details: The project consists of water loop installations along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway in the North Mainland District via open-cut and trenchless methods.
Purpose: The purpose of the project is to eliminate dead ends...
Project Info – North Mainland – Canal Road Water Production Facility
Project Number:
District and General Location: North Mainland District Canal Road Well Site at104 Canal Road
Total Budget: $TBD
Anticipated Construction Completion Date: Summer 2023
Details: The project consists of the conversion of an existing fire well to a Water Production Facility on Canal Road in the North Mainland District.
Purpose: The purpose of the project is to meet supply-demand and capacity, water storage capacity, and increased fire flow capacity into the region.