Project Info – Mainland – Water Pollution Rehab-Academy

Project Number: #906 District and General Location: Academy Creek Water Pollution Control Plant on 2909 Newcastle Street. Total Budget: $7.2M Anticipated Construction Completion Date: Summer 2022 Details: The project has a variety of system improvement projects related to rehabilitation or replacement of unit processes and facilities at the plant to ensure continuous and reliable operations. Purpose: The purpose of the project is to more effectively treat current flows and treat the estimated...

Continue reading

Project Info – Mainland – Basin 4036 CIPP

Project Number: #2001 District and General Location: North Mainland District Pump Station 4036 Gravity Basin Total Budget: $1M Anticipated Construction Completion Date: Summer 2022 Details: The project consists of Cleaning, Closed-circuit television, and Cure-in-Place Pipe (CIPP) rehabilitation of the sewer mainline in the North Mainland District Pump Station 4036 Gravity Basin ranging from 15-inch to 30-inch in diameter Purpose: The purpose of the CIPP process is to reduce and eliminate cracks,...

Continue reading

Project Info – Mainland – SPLOST 2016 Forcemain Reroute

Project Number: #702 District and General Location: North Mainland District along Harry Driggers Blvd, Canal Road, and Ogden Road Total Budget: $4.7 Anticipated Construction Completion Date: Summer 2022 Details: The project consists of nearly 20,000 linear feet of 12- to 20-inch forcemain and 2,500 linear feet of 12 to 14-inch watermain will be installed via an open cut or trenchless directional drill method. Purpose: The purpose of the project will reduce maintenance calls and disruptions. The...

Continue reading

Project Info – Systemwide – Annual Galvanized Replacement Program

Project Number: #2021 District and General Location: Various locations in North mainland, South Mainland, and Saint Simons Island District Total Budget: $250k Anticipated Construction Completion Date: TBD Details: The project consists of an annual allotment to remove galvanized lines that have corroded from the inside out, causing pinhole leaks, rusty color water, and fluctuation in water temperature and pressure. Purpose: The purpose of the project is to improve water quality and system reliability,...

Continue reading

Project Info – Mainland Brunswick – Pump Station 4035-4036 Upgrade

Project Number: #702 District and General Location: PS4035 on Ross Road, North Mainland District and PS4036 on B&W Grade Road, North Mainland District Total Budget: $2.6M Anticipated Construction Completion Date: Spring 2022 Details: The project consists of the repair of both station building roofs, painting, along with pump and piping modifications. Detailed station work includes the installation magnetic flow meter, an odor control unit, replacing outdated electrical and SCADA equipment,...